WoW - APM Tools
Overview
PSknowHOW support collecting data from Jira & Azure Boards. The basic of SCRUM or KANBAN need to be followed for KnowHOW to be calculate all KPI at project level and aggregate at above levels.
Following are the highlights of expected ways of working…
Any project can be configured with either Jira OR Azure.Based on the default setting of PSKnowHOW, all of the required fields will be populated. If a user wants to change the default setting, below are some key points to be considered.
SCRUM Dashboard Filters operates on the basis of Sprint and on KPIs, be default last 5 sprints data are shown, which can be configured to show upto 15 sprint.
Iteration Board KPI’s
Iteration board is configured to seek data from different Scrum projects. Based on selected projects and sprint, Iteration KPI’s shall populate with corresponding data points.
key Points -
Only Scrum projects are supported.
The selected project needs to have at least one sprint available for the KPI’s to show up.
Any user other than Superadmin shall have access to a Scrum project for data to be displayed on the Iteration board.
Any update on the Iteration board shall be followed by refreshing the data from Itertaion dashboard for a quick data update on Iteration board.
KPI’s Based on Defects -
Defects should be linked to Stories. defects that are not linked with stories will not be considered for these KPI data calculations.
For DSR, the defect should have an identifier discovered on production.
All defects should be linked with a story, even if the story is part of the previous Sprint which has been closed.
Defect status should be reflected via the appropriate stage in the workflow, rather than using comments or using another status.
Resolved defects should be reflected via their status as done/closed.
Rejected defects should be reflected via their status as canceled or resolution as configured in PSKnowHOW.
Similarly, it should be followed for other stages in the defect life cycle like Open, In Progress, In Development, Ready for QA, etc.
RCA drop-down field should be added in the Defect issue type. RCA values drive the info for RCA KPI.
Any Defect/Story being considered to work upon in a particular sprint shall be tagged to same.
KPI’s Based on Test Cases -
All Test cases should be linked with a Story (to get In Sprint Automation Percentage value).
if custom fields are used to identify regression and in-sprint test cases, check the custom fields related to it on the setting screen of PSKnowHOW.
Regression KPI can either be set up by Label or Customfield and is not dependent on Sprint.
Only those Test Cases which are to be automated will be considered for calculation and check the corresponding setting.
Test Execution Percentage and Capacity to be updated manually from the settings > upload.
Azure Boards Limitations
KPI Level Practise Guide -