WoW - APM Tools

WoW - APM Tools

Overview

PSknowHOW support collecting data from Jira & Azure Boards. The basic of SCRUM or KANBAN need to be followed for KnowHOW to be calculate all KPI at project level and aggregate at above levels.
Following are the highlights of expected ways of working…

Any project can be configured with either Jira OR Azure.Based on the default setting of PSKnowHOW, all of the required fields will be populated. If a user wants to change the default setting, below are some key points to be considered.
SCRUM Dashboard Filters operates on the basis of Sprint and on KPIs, be default last 5 sprints data are shown, which can be configured to show upto 15 sprint.

 

Iteration Board KPI’s

Iteration board is configured to seek data from different Scrum projects. Based on selected projects and sprint, Iteration KPI’s shall populate with corresponding data points.

  • key Points -

    • Only Scrum projects are supported.

    • The selected project needs to have at least one sprint available for the KPI’s to show up.

    • Any user other than Superadmin shall have access to a Scrum project for data to be displayed on the Iteration board.

    • Any update on the Iteration board shall be followed by refreshing the data from Itertaion dashboard for a quick data update on Iteration board.

KPI’s Based on Defects -

  • Defects should be linked to Stories. defects that are not linked with stories will not be considered for these KPI data calculations.

  • For DSR, the defect should have an identifier discovered on production.

  • All defects should be linked with a story, even if the story is part of the previous Sprint which has been closed.

  • Defect status should be reflected via the appropriate stage in the workflow, rather than using comments or using another status.

    • Resolved defects should be reflected via their status as done/closed.

    • Rejected defects should be reflected via their status as canceled or resolution as configured in PSKnowHOW.
      Similarly, it should be followed for other stages in the defect life cycle like Open, In Progress, In Development, Ready for QA, etc.

  • RCA drop-down field should be added in the Defect issue type. RCA values drive the info for RCA KPI.

  • Any Defect/Story being considered to work upon in a particular sprint shall be tagged to same.

KPI’s Based on Test Cases -

  • All Test cases should be linked with a Story (to get In Sprint Automation Percentage value).

  • if custom fields are used to identify regression and in-sprint test cases, check the custom fields related to it on the setting screen of PSKnowHOW. 

  • Regression KPI can either be set up by Label or Customfield and is not dependent on Sprint.

  • Only those Test Cases which are to be automated will be considered for calculation and check the corresponding setting.

  • Test Execution Percentage and Capacity to be updated manually from the settings > upload.


Azure Boards Limitations

Area

Behavior

Guideline

Area

Behavior

Guideline

Sprint Status

Last available sprint of the project will show as CURRENT as long as subsequent sprints are not defined, even when the sprint’s end date is out of sync with the calendar date

Projects using Azure Boards must create future sprints in advance to avoid data discrepancies

KnowHOW will generate sprint snapshots based on the Sprint Status only, i.e., a sprint will be considered as Active as long as the status is CURRENT in Azure Board, irrespective of the end date of the sprint

Area Path

If workitems are tagged across different area paths and the area paths are not included in the WIQL, KnowHOW will not fetch those as they don’t satisfy the criteria

At KnowHOW, project boards should be configured in such a way that it requires minimal updates

Scope Changes

Daily snapshots are formed at KnowHOW during an active sprint.
The final snapshot is frozen on closure of the sprint.

KnowHOW compares the latest snapshot with the previous day’s snapshot to determine the following scope changes

  1. Workitems added

  2. Workitems removed

Snapshot captured on Day 1 of the sprint is considered the Initial Scope of the sprint

The sprint snapshots will not get update based on changes that happen after the sprint is completed

Scope Completion

 

KnowHOW compares the latest snapshot with the previous day’s snapshot to determine the following

  1. completed workitems

  2. not completed workitems

 

Spilled issues

 

Not supported

KPI Level Practise Guide -

Segment

KnowHOW KPI

Best practices for KnowHOW integration

Minimal required Jira configuration

Segment

KnowHOW KPI

Best practices for KnowHOW integration

Minimal required Jira configuration

 

 

 

 

Speed

Sprint Velocity

  • Estimation completed on story points before start of iteration

  • Story point baselining should be practiced (i.e. start with base story with story point 1, and compare rest other stories with base story to estimate)

  • Estimation field in Jira story should be only “Story Point”. Any other estimation field on standard issuetype (i.e. Story etc) should be avoided.

  • Sprint should be added in standard issuetype (i.e. Story)

Commitment Reliability

  • Avoid scope change

  • Each planned story must have Sprint value set before start of sprint.

  • Nothing additional

Sprint Predictability

  • Avoid scope change

  • Each planned story must have Sprint value set before start of sprint.

  • Nothing additional

Issue Count

  • None

  • Nothing additional

Sprint Capacity Utilization

  • Time tracking (Original estimate, Remaining Estimate, Time Spent) field should be captured on sub-task level

  • Original estimate should filled in each sub-task before start of sprint

  • Time spent should captured before each end of the day during sprint execution

  • Time tracking (Original estimate, Remaining Estimate, Time Spent) field should be added only on sub-task level

Code Build Time

  • Integration with CI/CD, Repo tools

  • Nothing additional

Scope Churn

  • Estimation planning on story points

  • Sprint tagging to the issues before sprint start

  • Story point should be added for estimation in standard issuetype (i.e. Story)

  • Sprint should be added in standard issuetype (i.e. Story)

Build Frequency

  • Integration with CI/CD tools

  • Nothing additional

  • Jira integration with one of the CI/CD tool (Jenkins, Bamboo, Github Action, Azure Pipeline, Teamcity, Argo CD)

 

 

 

 

 

 

 

Quality

Defect Injection Rate

  • All logged defects must get linked with stories planned in sprint.

  • Provision to mandate that, if defect created then must get linked with story

First Time Pass Rate

  • Run time status update

  • All logged defects must get linked with stories planned in sprint.

  • Provision to mandate that, if defect created then must get linked with story

Defect Density

  • All logged defects must get linked with stories planned in sprint.

  • Root cause field is updated

  • Provision to mandate that, if defect created then must get linked with story

  • Root cause field is configured in defects

Defect Seepage Rate

  • Run time status update

  • All logged defects must get linked with stories planned in sprint.

  • Escaped defect field is configured

  • Provision to mandate that, if defect created then must get linked with story

  • Escaped defect field is configured in defects

Defect Removal Efficiency

  • Defects are planned in sprint

  • Nothing additional

Defect Rejection Rate

  • Defects are planned in sprint

  • Nothing additional

Defect Count By Priority

  • Link all defects with the stories in the sprint by priority

  • Nothing additional

Defect Count By RCA

  • Link all defects with the stories in the sprint by root cause

  • Root cause field is configured in defects

Created vs Resolved Defects

  • Defects are planned in sprint

  • Nothing additional

Regression Automation Coverage

  • In test management tool, select regression, automation options and complete traceability by mapping with story

  • Nothing Additional

In-Sprint Automation Coverage

  • In test management tool, select regression, automation options and complete traceability by mapping with story

  • Nothing Additional

Unit Test Coverage

  • Integration with SonarQube

 

Sonar Violations

  • Integration with SonarQube

 

Tech Debt - Sonar Maintainability

  • Integration with SonarQube

 

Sonar Code Quality

  • Integration with SonarQube

 

Test Execution and pass percentage

  • Integration with test management tool

  • Nothing additional

 

Value

Release Frequency

  • Link Jira issues tagged with the fix version

  • The release should have a start and end date

  • Nothing additional

  • Jira integration with one of the CI/CD tool (Jenkins, Bamboo, Github Action, Azure Pipeline, Teamcity, Argo CD)

  • Check the provision to mandate release start and end date when added fix version.

Value Delivery (Cost of Delay)

  • Epic (considered as feature in JIRA) should have the fields User-Business Value, Time Criticality, Risk Reduction and Opportunity Enablement

  • Epic should have User-Business Value, Time Criticality, Risk Reduction and Opportunity Enablement fields configured

PI Predictability

  • Planned and Actual value should be added in the Epic (considered as feature in JIRA)

  • Epic should have Planned Value and Actual Value fields configured

 

 

 

 

 

 

 

 

 

Iteration

Iteration Commitment

  • Estimation planning on story points

  • Before the start of the sprint, all items should have an estimate and added to the sprint

  • Story point should be added for estimation in standard issuetype (i.e. Story)

Planned Work Status

  • The due date must be added to the issues

  • Duedate should be configured in JIRA

Quality Status

  • All logged defects must get linked with stories planned in sprint.

  • Nothing additional

Dev Completion Status

  • Dev due date must be added to the issues

  • Dev duedate should be configured in JIRA

Work Remaining

  • Time tracking (Original estimate, Remaining Estimate, Time Spent) field should be captured on sub-task level

  • Original estimate should filled in each sub-task before start of sprint

  • Time spent should captured before each end of the day during sprint execution

  • Time tracking (Original estimate, Remaining Estimate, Time Spent) field should be added only on sub-task level

Defect Count By Status

  • All logged defects must get linked with stories planned in sprint.

  • Nothing additional

Defect Count By RCA

  • Link all defects with the stories in the sprint by root cause

  • Root cause field is configured in defects

Unplanned Work Status

  • The due date must be added to the issues

  • Duedate should be configured in JIRA

Defect Count By Priority

  • Link all defects with the stories in the sprint by priority

  • Nothing additional

Closure Possible Today

  • The due date must be added to the issues

  • Run time status update

  • Time spent should captured before each end of the day during sprint execution

  • Duedate should be configured in JIRA

  • Time tracking (Original estimate, Remaining Estimate, Time Spent) field should be added only on sub-task level

Issues Likely to Spill

  • The due date must be added to the issues

  • Duedate should be configured in JIRA

Wastage

  • Runtime status update

  • Nothing additional

First-Time Pass Rate

  • Run time status update

  • All logged defects must get linked with stories planned in sprint.

  • Provision to mandate that, if defect created then must get linked with story

Risk and Dependencies

  • Link all risk and dependencies in a sprint

  • Nothing additional

Estimation Hygiene

  • Time tracking (Original estimate, Remaining Estimate, Time Spent) field should be captured on sub-task level

  • Original estimate should filled in each sub-task before start of sprint

  • Time spent should captured before each end of the day during sprint execution

  • Time tracking (Original estimate, Remaining Estimate, Time Spent) field should be added only on sub-task level

Estimate vs Actual

  • Time tracking (Original estimate, Remaining Estimate, Time Spent) field should be captured on sub-task level

  • Original estimate should filled in each sub-task before start of sprint

  • Time spent should captured before each end of the day during sprint execution

  • Time tracking (Original estimate, Remaining Estimate, Time Spent) field should be added only on sub-task level

Iteration Burnup

  • Due date in all issues in a sprint

  • Nothing additional

Daily Standup

  • None

  • Nothing Additional

 

Developer

Mean Time to Merge

  • Integration with the Repo tool

  • Nothing additional

PIckup Time

  • Integration with the Repo tool

  • Nothing additional

PR Size

  • Integration with the Repo tool

  • Nothing additional

Rework Rate

  • Integration with the Repo tool

  • Nothing additional

Check-Ins & Merge Requests

  • Integration with the Repo tool

  • Nothing additional

 

 

 

 

Release

Release Burnup

  • Link all issues with the release

  • The release should have a start and end date

  • Dev duedate & Due date must be added to issues

  • Estimation planning on story points

  • Dev duedate and Due date should be configured in JIRA

Release Plan

  • Link all issues with the release

  • The release should have a start and end date

  • Dev duedate & Due date must be added to issues

  • Estimation planning on story points

  • Dev duedate and Due date should be configured in JIRA

Release Progress

  • Link all issues with the release

  • The release should have a start and end date

  • Nothing Additional

Defect Count By Status

  • Link all defects with the release

  • Nothing Additional

Defect Count By Assignee

  • Link all defects with the release

  • Defects should be assigned

  • Nothing Additional

Defect Count By RCA

  • Link all defects with the release

  • Root cause field is updated

  • Root case field should configured in JIRA

Defect Count By Priority

  • Link all defects with the release

  • Add priority

  • Nothing Additional

Defect By Testing Phase

  • Link all defects with the release

  • Add Testing Phase

  • Configure testing phase in Defects

Epic Progress

  • Runtime status update of epic in JIRA

  • Nothing Additional

DORA

Change Failure Rate

  • Integration with the SCM tools

  • Nothing Additional

  • Jira integration with one of the CI/CD tool (Jenkins, Bamboo, Github Action, Azure Pipeline, Teamcity, Argo CD)

Deployment Frequency

  • Integration with the SCM tools

  • Nothing Additional

Lead Time for Change

  • Integration with the SCM tools

  • Nothing Additional

  • Jira integration with one of the CI/CD tool (Jenkins, Bamboo, Github Action, Azure Pipeline, Teamcity, Argo CD)

  • Check the provision to mandate release start and end date when added fix version.

Mean Time To Recover

  • Create and close Incident on run time in JIRA

  • Configure Incident issuetype in JIRA

 

 

 

 

 

 

 

 

 

Backlog

Backlog Readiness

  • Estimation completed on story points before start of iteration

  • Story point baselining should be practiced (i.e. start with base story with story point 1, and compare rest other stories with base story to estimate)

  • Estimation field in Jira story should be only “Story Point”. Any other estimation field on standard issuetype (i.e. Story etc) should be avoided.

  • Sprint should be added in standard issuetype (i.e. Story)

Iteration Readiness

  • None

  • Nothing Additional

Production Defects Ageing

  • Link all defects with the release

  • Add Testing Phase

  • Configure testing phase in Defects

Defect Reopen Rate

  • None

  • Reopen transition and status should configured in defects from “In Testing”, “Ready for testing”, In UAT & Closed